The Mariani project was a the full deconstruction of three structures: a 4,389 sq ft house, a 680 sq ft garage built in 1983 and a 1920’s era pool house. DRN develops programs for property owners to ensure structures slated for remodel or tear down will be reused and recycled. Most projects are completed in 3 weeks or less.
According to DRN President Lorenz Schilling, “A typical home can yield as much as 85% diversion through reuse and recycling. With traditional home demolition, tons of materials are sent to the local landfill, the majority of which can be reused in their current state in other homes. Deconstruction is a win-win for the environment and the community.”