Georgia-Pacific to raze 11 unused buildings near downtown Camas – The Columbian

Buildings just north of the main Camas paper mill site sit vacant on Jan. 7.

Buildings just north of the main Camas paper mill site sit vacant on Jan. 7. (Joshua Hart/The Columbian) Photo Gallery

Nine of the buildings to be demolished were built between 1929 and 1970, according to G-P’s demolition plan. They include a two-story, 31,360-square-foot development lab; a four-story, 31,000-square-foot nonwovens manufacturing building; a three-story, 11,000-square-foot office building; a two-story water treatment building; two warehouses; a 3,500-square-foot library; and a one-story microscopy laboratory.

Source: Georgia-Pacific to raze 11 unused buildings near downtown Camas – The Columbian