
Conor set up a camping chair as part of a peaceful protest (Image: Jake Loader)
Demolition work at the University of Sheffield’s Social Sciences building was brought to a halt for two hours after a resident sat in a camping chair on the site in protest against the “deafening” noise levels.
Source: Angry Sheffield man cheered on as he stages camp chair protest in middle of construction site – YorkshireLive

ROSS GIBLIN/STUFF
Imploding the building was an option but considered too risky to public safety.
“You can’t put a dollar value on health and safety.” Deconstruction was a more conservative option but the company did not want to end up in court if demolition caused problems.
Source: The bulk of the BNZ building in Wellington will be re-cycled and re-used | Stuff.co.nz

“There is no give up,” Murrah said. “When you got this kind of beauty build somewhere else. It’s that simple.”
Source: Seminole neighbors try to stop demolition at Tides Golf Club

Behind Shannon Park School stands one of many military housing units to be demolished. Parents have raised concerns over the demolition and air quality risks that may result during the project. (CONTRIBUTED)
She added that air-quality samples are taken on a regular basis, and that Canada Lands will be sharing the results with the principal. The demolition is now half complete, according to Millier, with an expected wrap-up date in mid-April. The deconstructed materials, besides coming down, need to be removed from the site as well. The demolition has been slowed as contractors dispose of asbestos, lead-based paint and mould found in the roughly 40 buildings on the property.
Source: Shannon Park School voices concern over air quality during demolition | The Chronicle Herald
Reclamation Administration: News and Research on Building Material Waste Prevention